News brief · This is a short, dated summary. Consult its linked sources and the news archive for context and follow-up reporting.
Residents of Catherine Hall and West Green in St James are waiting for relief from repeated flooding, after the National Road Operating and Constructing Company promised to accelerate drainage mitigation measures.
Radio Jamaica’s October 13 report followed a NROCC statement issued Monday night. The company said flooding predates the Montego Bay Perimeter Road Project; residents have blamed project works and appealed for an urgent drainage fix.
Why the area floods
NROCC attributed the problem to intense weather, low elevation and limited drainage capacity. It said Catherine Hall lies between two rivers and the sea, making it vulnerable when heavy rain coincides with elevated coastal water levels.
The company said Hurricane Melissa worsened existing weaknesses through debris, sediment and erosion. Its assessment found that river discharge and storm surge restricted drainage outflows.
What NROCC has promised
A drainage study forms part of the Perimeter Road Project. NROCC says it will speed up identifying and implementing measures arising from that work, while drainage improvements on West Green Avenue and channel clearing continue.
The report gives no firm completion date. Residents’ immediate concern remains whether these measures will prevent another damaging flood.
Sources
Coverage of Tuesday, 13 October 2026. Sources checked on 14 October; event dates and statistical cut-offs are stated in each report.
